Selling Your Home · Westchester County · 2026

Open Permits When Selling a House in Westchester

By Cristian Poblete, Home Improvement Contractor · Ossining, NY · Updated October 2026

Quick answer: an open permit is a permit that was issued but never closed with a final inspection. Open permits, expired permits, and work done with no permit at all usually come to light when the buyer's side checks building department records. Fixing them before you list is faster and cheaper than fixing them under a closing deadline.

The four problems buyers find

ProblemWhat it meansTypical fix
Open permitWork was permitted but never got a final inspectionFinal inspection, correct any items, close out
Expired permitThe permit lapsed before it was closedPay renewal fees, then inspect and close
No permitA deck, finished basement or bathroom built without a permitApply after the fact (penalty fees), drawings, inspection
No certificate of occupancyCommon in older homes; the house or an addition never got a COCO or a letter from the building inspector

A Mt. Kisco real estate firm puts it plainly: in Westchester County, many older homes do not have a Certificate of Occupancy. That isn't always a problem. Some building inspectors will write a letter confirming that an older improvement predates the zoning code or didn't need a permit.

Why it matters at closing

What Westchester towns charge

Work done before a permitRecords, letters & COs
Town of YorktownPermit fee doubled. Expired permits: cumulative fees for the expired yearsCO (under 4,000 sq ft) $125 · non-conforming CO letter $25 · pre-date letter $175 (master fee schedule)
Town of CortlandtAll fees doubled. Expired permits issued before 2024: current renewal fee to close; from 2024: all cumulative renewalsRecords request $150 + $20 per certified copy · residential certificate of completion $50
Village of OssiningFee tripled, or $1,000, whichever is greaterResidential title search $150 · CO $75–$225 by job value · pre-date CO letter $100 first inspection
Village of TarrytownLegalization fee equal to double the permit feeResidential CO $150 · copy $20

For the base permit fee these penalties multiply, use the Westchester permit cost calculator.

How to clear it before you list

  1. Pull your file. Ask the building department for your property's permit history and CO records. Do this before you sign with a broker.
  2. Compare it to the house. Walk through: finished basement, extra bathroom, deck, enclosed porch, garage conversion, new windows or a big kitchen remodel. Anything not in the file is a question a buyer will ask.
  3. Close the open permits. Finish any remaining work, book the final inspection, correct anything flagged, and get the certificate.
  4. Legalize the rest. Apply after the fact. Expect penalty fees, and for structural or larger work, drawings by an architect or engineer. Inspectors may need walls or ceilings opened to see framing, wiring or plumbing.
  5. Hand the paperwork to your attorney before the contract goes out.

Start two to three months before listing. Inspection calendars, drawings and corrective work all take time, and a buyer with a closing date has no reason to wait for you.

We finish incomplete permitted work, fix items that failed inspection, and open and patch walls for inspections, working with your architect or engineer when drawings are needed.

📅 Free estimate

Buying, not selling?

Ask for the building department records during due diligence and compare them to the house. Write into the contract who pays to close any open permits, and leave enough time to object if something turns up. Your attorney will handle the wording.

This guide is general information from a contractor's perspective, not legal advice. Talk to your real estate attorney about your contract.

Related: Permit cost calculator · Shed permits in Westchester · Gazebo permits in Yorktown · How to hire a contractor

Also see: improvements worth making before you sell

Sources

Fees and rules below come from each municipality's published documents, checked October 2026. Towns change fees by board resolution, so confirm with the building department before you apply. This guide is general information, not legal advice.

Frequently Asked Questions

Yes, nothing stops the sale itself, but open permits and work without a certificate of occupancy usually come up during the buyer's due diligence. Lenders usually require certificates of occupancy, and a buyer may ask you to close the permits or give a credit. Closing them before you list is usually the cleanest path. Ask your attorney about your specific contract.

Ask your town or village building department for the permit history and certificate of occupancy records on your property. Some charge for a records search, for example $150 for a residential title search in the Village of Ossining, or $150 plus $20 per certified copy in Cortlandt.

Finish any remaining work, schedule the final inspection, correct anything the inspector flags, and get the certificate of occupancy or completion. If the permit has expired, most towns require a renewal fee first.

Towns typically charge a penalty multiple of the normal permit fee: Yorktown and Cortlandt double it, the Village of Ossining triples it or charges $1,000, whichever is greater, and Tarrytown charges a legalization fee equal to double the permit fee. Drawings, any corrective work, and opening walls for inspection come on top.

It depends on the work and the town's inspection schedule. Start at least two to three months before you list. Closings commonly happen about 60 days after the contract is signed, and permit problems found late can push that back.